Breakthrough in Bottleneck Analysis using Industry 4.0

Robotic arms assembling a car on an automated production line, representing Industry 4.0 advancements in smart manufacturing.

Serial production has become the norm in the design of manufacturing processes in modern times. The serial lines work by serially interlinking machines carrying out different operational steps through part transport (conveyors, robots, trolleys), such that multiple machines are operating on different operating steps of different parts parallelly, to deliver one finished part at the end of the line at a “takt time” that defines the production rate of the line. It is a common practice to name the operational steps as OPs, numbered serially in intervals of 10 (like OP10, OP20, etc.) to enable any additional OPs to be inserted in the sequence later on.

About the Author

Dr. Ranjit Date, Co-CEO of Wipro PARI and Director of Wipro Linecraft AI, leader in manufacturing and Industry 4.0 innovation.

Dr. Ranjit Date

Ex-CEO, Wipro PARI
Ex-Director, Wipro Linecraft AI

Dr. Date is a visionary leader in manufacturing management. He co-founded Precision Automation & Robotics India (now Wipro PARI) and made it India’s largest industrial automation company over three decades.

His strategic foresight is evident in his early investments in EV technology, which positioned Wipro PARI as a global leader in EV automation.

He became the Co-CEO of Wipro Infrastructure Engineering’s Automation Solutions and Co-founded Wipro Linecraft AI in 2017, spearheading innovation in Industry 4.0 with cutting-edge machine analytics and a growing team of AI and manufacturing experts.

The takt time of any individual operating step is defined by two factors:

The production rate of various assets involved in completing the step (machines, transport, and tools)

The rate of inputs to that step (operators, sub-parts being added on the line)

Bottleneck analysis in a manufacturing process, highlighting OP30 as the bottleneck asset with the longest cycle time.

The “constraint” (also called the “bottleneck”) in the line is that operating step which takes the maximum time in the serial operations. Both its upstream and downstream neighbors produce faster than this operating step.

This means that the faster upstream processes are blocked, i.e., forced to wait for the bottlenecks in the manufacturing process to catch up, whereas the downstream processes are starved, i.e., not receiving parts at the rate they could handle. This way, the entire line experiences idle time while the bottleneck asset in manufacturing continues to operate at its limiting pace.

Identifying the bottleneck is the key to optimizing manufacturing performance.

The bottleneck, being the slowest step, sets the pace for the entire production line. Hence, improving the efficiency of the bottlenecks in manufacturing operations directly enhances the productivity of the entire production line.

Conducting a detailed production bottleneck analysis can help pinpoint these inefficiencies more precisely, guiding improvements where they matter most.

Improving the performance of non-bottleneck processes beyond the pace set by the bottleneck will increase idle time and not improve production.

Eli Goldratt’s book, The Goal, famously made this Theory of Constraints approach popular in manufacturing.

Identifying the bottleneck is the key to optimizing manufacturing performance

Performace

Assets working slower than the required rate

Availability

Assets stopping to work due to failures or “downtime”

Quality

Assets producing bad parts that cannot be processed further by next operations

Are Pre-designed Bottlenecks in Manufacturing a Convenient Solution?

Since it is extremely difficult to manage lines with shifting bottlenecks in manufacturing operations, line design practices propose a “managed bottleneck” approach – intentionally creating a single bottleneck by design (“design bottleneck”) at or towards the end of the line. At least in theory, this allows only one process to be focused on to be run optimally.

However, this convenience comes at a cost because it would mean overdesigning all other assets, effectively using them ineffectively. Hence, this approach is rarely practiced.

Furthermore, by design, only the performance bottlenecks in manufacturing can be pre-designed. The availability & quality bottlenecks are not expected through high reliability and high process capability machines to ensure relatively low impact to cause bottlenecks. Wherever a high impact or risk is anticipated, a “buffer” is designed to store the parts before & after the process step where high variation is expected, and design the process step itself for a higher throughput than the expected line throughput.

Industrial Engineering Approach has Multilateral (and often Hidden) Challenges

A measure of line performance, OLE (Overall Line Effectiveness) and individual asset performance, OEE (Overall Equipment Effectiveness), captures these performance measures, allowing the manufacturing engineer to evaluate how the line is performing.

When the performance of the line is lower than expected, it is required to identify the bottleneck in the manufacturing process that is causing the performance loss. If the bottlenecks in manufacturing are “persistent” (consistently present with statistically repeatable behavior), there are Industrial Engineering techniques available for identification:

  • Performance bottlenecks in the manufacturing process can be identified using cycle time study, filtering out the waiting times of the asset to compute the net cycle time of the asset.

  • Availability / MTBF / MTTR studies will capture downtime bottlenecks.

  • FTQ studies can capture quality-related bottlenecks.

IIoT (Industrial Internet of Things) – One of the pillars of Industry 4.0 – aims to boost the manufacturing performance through use of data. It promises not only to enable Industry to reach the elusive 85% OLE – but to set new standard for industry that will exceed 85%.

In a series of mini bulletins that follow, the principles and examples of this improvement through use of IIoT – specifically the Linecraft AI product suite, that enable this transformation.

Traditional Approach to Identifying the Bottleneck Operation

"Breakthroughs in bottleneck analysis have revolutionized the way manufacturers identify and address production constraints, rendering the 'managed' bottleneck approach obsolete."

The “managed” bottleneck is no longer supported by the industry, since this makes all the other assets idle, wasting the effectiveness of their investment. As a result, serial manufacturers build “balanced lines” (no design bottleneck) where all the operational steps are designed to perform very close to the required takt time.

In a balanced line, there are “transient” variations in performance - which aren’t systemic issues with the line but instead, short-lived disturbances caused by temporary factors. Transient variations or operational variances lead to some mismatches in time-to-time production rate. This makes it very difficult to pinpoint the bottleneck because each time the performance of the line is monitored, different observations are captured.

What makes the problem significant is that in a serial line, the losses are multiplicative. Any stoppage on the line will cause partial blocking & starving of all other assets.

For instance, let’s assume that all assets are operating with 97% OEE, but if their slowdowns and stoppages happen at different times, the OLE of the serial line of a 20-step process will drop down to a meagre 54%.

Multiple such issues happen in multiple assets at multiple times under different conditions. Trying to fix the issues as they are being observed ends up in a “whack a mole” approach – a lot of effort, but no result. If there was a way to identify “top issues” and work on them selectively, this process can become manageable.

Finally, creating buffers to isolate the effects of such losses from serial production has its own limitations – it bloats up work-in-progress causing financial loss, consumes space, causing capital loss, issues remain hidden longer – causing waste, hence directly contradict single piece flow principles.

Therefore, if buffers are to be provided, there should be only a few select locations, and in minimum quantities. These decisions also require analytical tools to be able to identify top priority issues, their causes and controllability, and their frequency (to identify optimum quantities).

One would correct the controllable
issue, rather than buffer for it.

What causes the “Transient Bottlenecks”?

There are various use cases in practice, which although might happen in 5-10% of the cases of cycles on each asset, their cumulative impact in the line performance can be devastating. Only a few common examples are captured below:

01

Effect of cycle time variance

90% of cycles are happening within cycle time - even faster than cycle time, but 10% of the cycles take slightly longer due to some cycle time elements – like manual actions, readjustment of the part position, part cleaning/verification tasks, replacing defecting part, etc. In this case, the average cycle time may be within the required cycle time, but the 10% cycles which exceeded the cycle time led to other assets being blocked and starved for the exceeded time – creating a multiplicative slowdown effect on the production.

02

Effect of acyclic operational requirements

Some periodic operational requirements periodically (like bin/trolley exchange, calibration verification, tool change, SPC, PM tasks like machine and chip cleaning) cause higher time repeatedly after a few cycles. The machine itself might have its production rate compensated for these losses, but for the line, the faster production rate only results in idle time for the machine, but slower time causes other assets to be blocked or starved.

03

Effect of line operation requirements & constraints

Practical considerations (like shift changes, setup changes, operator breaks, and material logistics delays) cause loss of cycle time at the boundaries of these actions – and the performance effect cascades in the serial lines until again a “rhythm” of production rate is reestablished.

04

Effect of interactions between assets, flow path disturbances

Disturbances in the flow path create transient bottlenecks – including interface conditions, interlocks, and waits between interacting assets like machines & the transport systems, different paths caused by merges & diverts by series parallel path combinations, or rework loops.

05

Effect of micro-interruptions/stoppages

When a serial production line has multiple unstable processes or assets which cause micro-stoppages, their combined effect on the line flow cascades, causing a significant impact on the line performance.

The new approach to Bottleneck analysis – using Linecraft AI

Industry 4.0 tools have emerged to help solve such problems that were previously thought unsolvable. These tools are based upon the analysis of a large volume of data over a large period of time, eliminating the limitations of not having detailed-enough information and not enough time of information.

The most logical solution for identifying bottleneck is to monitor the “flow.”

Structural bottlenecks in the manufacturing process will cause low flow throughout the line, but transient bottlenecks will cause dynamic increases and decreases in the flow at different sections of the line.

Industry 4.0 tools enable this very analysis, providing a direct view into both types of bottlenecks in the manufacturing operations.

Linecraft AI is one such analysis system that has a unique algorithm which is able to distinguish the times attributable to an asset’s own operation and the time loss caused by the effects of “external” factors – not intrinsically a part of the asset operation.

This enables the “flow” through the assets to be modeled by “waits” caused in the asset and form patterns over larger periods of analysis for:

Structural Bottlenecks

Specific assets are always the bottlenecks in a manufacturing process– this might be due to the asset’s own issues like high cycle times or low availability.

Transient Bottlenecks

Specific assets or cells become bottlenecks in a manufacturing process intermittently. The transient bottlenecks are then prioritized by impact & frequency to determine opportunities for improvement.

Structural bottlenecks can be eliminated through asset level optimization of the issues – whether due to cycle time by optimization, or availability by pareto analysis of losses, and elimination of the root causes of the specific reliability issues.

For Transient bottlenecks, the main causes need to be found.

Linecraft analysis allows high impact and high frequency issues, enabling manufacturers to identify transient bottlenecks quicker than ever. Once identified, the improvement approaches can then be:

1. Improved operating patterns - preparation, planning and setup improvements for the shift, setup, material changes, etc.
2. Improvement of equipment/interface design to remove losses in interactions/flow disturbances.
3. Buffering the cells with adding buffers to isolate effects of acyclic operations / beyond solution instability issues.

01

Improved operating patterns - preparation, planning and setup improvements for the shift, setup, material changes, etc.

02

Improvement of equipment/interface design to remove losses in interactions/flow disturbances.

03

Buffering the cells with adding buffers to isolate effects of acyclic operations / beyond solution instability issues.